CONSTRUCTION OF SUSPENSION BRIDGE OF FIERZA HPP

Contract Title: “Reconstruction of connection Bridge of discharging tunnels T3, T4 portals and external surroundings of Fierza HPP”

Fierza HPP is the first hydropower plant of the cascade built on Drini River. This HPP is one of the biggest in Balkans, with an installed capacity of 500 megawatt (MW), dam of which has created a reservoir (Fierza Lake) with a total volume of 2,7 billion cubic meters of water and an area of 7.2 square km.  Fierza HPP is managed by Albanian Power Corporation Jsc. (KESH SH.A.), company with sole shareholder the Albanian State.

KESH SH.A., through a construction contract, entrusted to our company “2RC” the execution of these works, specifically “Providing of access for works of supply, utilization, maintenance and repair of the mechanisms of electro-mechanical gates into the entrance portals of discharge tunnels T3, T4 in Fierza HPP, through the reconstruction of the connection footbridge and other ancillaries facilities, as well as increase of the holding capacity of the bridge up to 3.5 tones. This project was entirely and successfully performed within a period of 5 (five) months.

We emphasize from the works performed the followings:

  • Earthworks; demolitions; concreting works; alucobond wearing; finishing & painting, tiling works; windows and doors;
  • Realization of steel constructions, steel railings and stairs, and steel meshes;
  • Entrance extension of tower 4 (and construction of steel structure suspension bridge with 4m width);
  • Extension of suspension bridge pillars;
  • Works on main structure, footbridge (suspension bridge) through wire ropes, clamps and bolts, and special lightning of the suspended footbridge.